MONDAY
  
 1. go to Home Depot and arrange for a door to be installed between the kitchen and the hall
  
 2. get a decent sized pool to use for personal excersize and heat relief. 15 feet wide circle by 3 feet deep
  
 TUESDAY
  
 3. move Stewarts truck and sweep/rake his parking space
  
 4. go back to home depot and get some paving tiles to create a base to put the pool on, and a 100 foot extension cord, nails, boards, and plastic lattice 
  
 WEDNESDAY
  
 5. lay out tiles, attach pipes/boards to frame the parking spot
  
 6.  meet with crew to install door, and pick out a door
  
 THURSDAY
  
 7. rig up electrical to run the pool filter, hang shade cloth to enclose the new pool area
  
  8. set up pool and filtration system, fill the pool
  
 FRIDAY
  
 9.  finish organizing my witches closet
  
 SATURDAY
  
 10. work on paint touch ups in my clinic
  
 11. set up fountain in clinic